These are some of the most recent photos from the site. Look at the other pages shown to the left for more photos and details.
Snow comes to the project (Nov 2003)
Back view with O'Malley
Interior stone work starting
Plastic on the windows for the Winter
Inside view of Jake's room (2nd floor)
Upper and lower beams
Painting the steel beam on the front
Detail of the front beam painted with Ross
View of the creek
Another view of the creek
Finished fountain
Close-up of the fountain
View of lawn and steps
Lifting the roof beams
View of the rear side
View of the front
More rafters
Pouring the last of the concrete in the blocks
Pulling into place
Putting up the first rafter
The view from the creek
Jon inspecting the top
last of the back wall
starting the rock columns
Last of the Durisol blocks are moved upstairs
Grass begins to sprout in backyard
Filling the Durisol blocks with concrete and fly ash
The living room
View out the back door
Burning holes in the steel frame
Fitting the beam
Toe-nailing the beam
Third floor framing
Ross & Jon
Moving one of the front rocks into position
Planting the rear lawn
Copyright 2003, 2004 Jonathan Stoumen Architect