Plaster Detail

2003 Photos

These are some of the most recent photos from the site. Look at the other pages shown to the left for more photos and details.

 

Snow comes to the project (Nov 2003)

Back view with O'Malley

Interior stone work starting

Snow comes to the project (Nov 2003)

Back view with O'Malley

Interior stone work starting

Plastic on the windows for the Winter

Inside view of Jake's room (2nd flr)

Upper and lower beams

Plastic on the windows for the Winter

Inside view of Jake's room (2nd floor)

Upper and lower beams

Painting the steel beam on the front

Detail of the front beam painted with Ross

View of the creek

Painting the steel beam on the front

Detail of the front beam painted with Ross

View of the creek

Another view of the creek

Finished fountain

Close-up of the fountain

Another view of the creek

Finished fountain

Close-up of the fountain

View of lawn and steps

Lifting the roof beams

View of the rear side

View of lawn and steps

Lifting the roof beams

View of the rear side

View of the front

More rafters

More rafters

View of the front

More rafters

More rafters

Pouring the last of the concrete in the blocks

Pulling into place

Putting up the first rafter

Pouring the last of the concrete in the blocks

Pulling into place

Putting up the first rafter

The view from the creek

Jon inspecting the top

last of the back wall

The view from the creek

Jon inspecting the top

last of the back wall

starting the rock columns

starting the rock columns

Last of the Durisol blocks are moved upstairs

Grass begins to sprout in backyard

Filling the Durisol blocks with concrete and fly ash

The living room

View out the back door

Burning holes in the steel frame

Fitting the beam

Toe-nailing the beam

Third floor framing

Ross & Jon

Moving one of the front rocks into position

Planting the rear lawn

Copyright 2003, 2004 Jonathan Stoumen Architect